Euler logo
Quiet build phase

The future of power optimization

We turn electrical power into planned mission fuel — predictive planning, EMCON‑aware dispatch, and edge decision aids that sustain tempo under pressure.

Plan

Auto‑build power plans from phases, assets, and thresholds. Encode SoC floors, EMCON windows, and reserves.

Optimize

Right‑size generator/BESS dispatch, avoid idle stacks, and prioritize mission‑critical loads.

Sustain

Edge agents propose delta‑COAs in minutes during jamming or weather dips and log outcomes for learning.